Network Rail TPCMS

Project Overview

Network Rail TPCMS: National SCADA Migration, V5.1 Strategy & Technical Assurance

Employer: Telent (for Network Rail)
Sector: Rail, SCADA, Operational Technology, Electrification
Location: UK-Wide / National
Role: Technical Specialist / Consultant
Period: June 2025 – Present

Executive Summary

As a contract Technical Specialist / Consultant engaged via Telent for Network Rail on the Traction Power Centralised Management System (TPCMS), I joined the national V3 to V5 rollout approximately 30% into deployment. Initially brought in to deliver workstation upgrades, my remit quickly expanded into site integration, deep technical troubleshooting, software FAT, over and back testing, defect management, change implementation, and migration strategy development within a safety-critical traction power environment.

I have since integrated 5 sites directly and supported a further 7 sites across the rollout, closed 30 defects, written the V5.1 migration strategy, and developed a bespoke registry editing tool to enforce configuration consistency for printer-related changes, reducing user error and preventing critical faults. My role sits at the intersection of migration delivery, root cause analysis, operational assurance, and controlled deployment.

Objectives / Challenge

Support the safe migration of TPCMS from V3 to V5 during an active national rollout while maintaining system stability and operational confidence.

Investigate and resolve post-release issues where application updates interacted differently than anticipated with the Windows operating system and underlying hardware or configuration, affecting requirements compliance.

Ensure the upgraded platform could safely control traction power assets, provide correct notifications to ECOs, and support switching and plant operations when required.

Lead controlled over and back testing, defect management, and formal change processes so that fixes could be validated and introduced without detrimental impact to a safety-critical system.

Approach / Solution

  • Migration Delivery & Site Integration:
    • Delivered workstation upgrades and managed controlled transition from V3 to V5 for testing activities, followed by safe reversion at the end of the test window.
    • Integrated 5 sites directly and supported a further 7 sites during rollout, assisting ECOs with operation of the upgraded system and building operational familiarity.
    • Cross-referenced legacy and upgraded system behaviour to confirm expected operation and identify variances.
  • Root Cause Analysis & Technical Troubleshooting:
    • Replicated issues in a controlled reference environment with appropriate logging measures in place.
    • Used Windows logging and application-specific diagnostic tools to trace faults across multiple log sources and system layers.
    • Researched low-level OS behaviour associated with affected features to determine true root cause rather than treating symptoms.
    • Diagnosed, recommended, and implemented fixes for complex issues involving interaction between the TPCMS application, Windows OS, and configuration or hardware layers.
  • Testing, FAT & Defect Management:
    • Acted as lead test engineer for over and back testing, verifying that the system could safely control traction power and provide correct indications and notifications to ECOs.
    • Performed software Factory Acceptance Testing on the TPCMS front end ahead of wider deployment.
    • Updated test documentation, logged defects, managed them through to closure, executed tests, and completed sign-off activities.
  • Change Governance, Tooling & Strategy:
    • Assessed remediation options through risk analysis, selecting the approach with the highest probability of success and the lowest risk of negative impact.
    • Drafted and presented change notes to the Change Advisory Board, gaining approval from Telent and Network Rail before implementation.
    • Wrote the V5.1 migration strategy, using live rollout experience, defect trends, and testing outcomes to support safer future deployment.
    • Developed a bespoke registry editing tool to enforce consistency and safely roll out printer configuration registry edits, reducing user error and preventing critical configuration faults.

Outcomes / Results

Site Delivery:

  • Integrated 5 sites directly and supported a further 7 sites across the national rollout.

Defect Resolution:

  • Closed 30 defects through structured root cause analysis, controlled testing, and assured change implementation.

Faster Acceptance:

  • Early defect detection and closure improved deployment confidence and helped accelerate client acceptance.

Operational Assurance:

  • Delivered over and back testing and front-end FAT activities, helping confirm safe control of traction power assets and reliable operator interaction.

Risk Reduction:

  • Reduced configuration risk by introducing a tooling-based approach to registry edits, improving consistency and preventing critical errors.

Expanded Technical Ownership:

  • Progressed from workstation upgrade delivery into a trusted technical role covering troubleshooting, testing, change implementation, site integration, and migration strategy.

Key Technologies & Methodologies

  • Traction Power Centralised Management System (TPCMS)
  • SCADA migration and operational assurance
  • TPCMS V3, V5 and V5.1 migration planning
  • Windows OS logging and low-level behaviour analysis
  • Application diagnostics, log correlation, and root cause analysis
  • Controlled reference environment replication
  • Over and back testing, FAT, defect tracking, and test documentation
  • Change notes, CAB presentation, and deployment governance
  • ECO operational support and system familiarisation
  • Registry-based tooling and configuration control